Hi guys, ive taken a main bond to the gas pipe which is in steel as its a commercial job, where it enters the property, which also has a gas shut off switch there. however the pipe then runs 15-20m inside the building where it connects into a gas meter still inside the building.
it then runs around the building from the otherside of the meter.
so really i have bonded the incoming not out going, its a strange one.
i was thinking of putting a link acoss both pipes just above the meter so the outgoing is bonded too.
what your views and advice on this please??
it then runs around the building from the otherside of the meter.
so really i have bonded the incoming not out going, its a strange one.
i was thinking of putting a link acoss both pipes just above the meter so the outgoing is bonded too.
what your views and advice on this please??