Good day! I have a 200 AMP service with the main shut off installed outside. From there, 60 AMP line to hot tub, separate main feed to what is now my "sub panel" ( main box) in my basement. My dilemma is that my common bus bar is full. As it is now a sub panel, I cannot place any commons onto the ground bus bar. If I add an additional common bar, how do I bond it to the existing common bar? Also, do I have to ensure that no ground wires come into contact with it, which will limit my options for installation, or force me to re-route some circuits within the box?
Thanks!