Good morning all I have a summer assignment that I need to have ready before the 4th of September and I have 4 tasks that I have yet to complete.
task 2 of my assignment is to list and explain all the steps required to carry out dead testing, what instrument is needed, and its setting and voltages (if any).
Task 3 with drawings gives explanations of 3 earth fault loop paths and names each one.
Task 4 states the full safe isolation procedure and all the steps and equipment required for a single-phase and 3 phase system.
Task 5 Explain the term ADS when talking about the electrical safety of electrical circuits.
any page numbers in books or information/videos that explain things nicely would be greatly appreciated.
task 2 of my assignment is to list and explain all the steps required to carry out dead testing, what instrument is needed, and its setting and voltages (if any).
Task 3 with drawings gives explanations of 3 earth fault loop paths and names each one.
Task 4 states the full safe isolation procedure and all the steps and equipment required for a single-phase and 3 phase system.
Task 5 Explain the term ADS when talking about the electrical safety of electrical circuits.
any page numbers in books or information/videos that explain things nicely would be greatly appreciated.