S
stuart569
Currently doing flats and main contractor asked if i could run in split concentric cable from communal stairwell cupboard to 7 flats. Ready for dno to connect at both ends.Cable will be going up cable tray then through wall to meter in each flat. Firstly should the DNO be doing this? Secondly does this cable fall under 522.6.5 - 522.6.8?