Hi all, if a supply to an outhouse is ran through an overhead length of steel pipe, is it necessary to bond the metal pipe?
My thinking is that the pipe is an exposed conductive part and therefore should be bonded
Could anyone clarify.
Many thank`s
My thinking is that the pipe is an exposed conductive part and therefore should be bonded
Could anyone clarify.
Many thank`s