I know PV installers sometimes use SWA to carry DC into the house especially when the PV is ground mounted.
Can anyone help me understand the correct way of doing the following:
1) Earthing the SWA armour, should this just be connected to the house earth as it would for AC or something else, I have been told it can be left floating but would like to know if this is correct.
2) Assuming the voltage and current are within the cable spec is it OK to run 2 separate PV strings via a single run of 4 core SWA.
Thanks