Ive recently taken over a rewire as the original sparks wasnt qualified to carry out the work. Ive just got a few issues Im not sure about myself.
Firstly, they have wired a socket to the boiler on the ring and are planning on putting it on a plug top, I thought this was a no no and the boiler needed to be on a dedicated supply. Am I right?
Secondly, they have used IP rated fittings in the bathrooms but there the fittings where you need to put the heat prove sleeving over the cores. Its been wired three plate method but all the cables have been bought into the fitting, now I was under the impression that it need to be joined in the ceiling and a single cable bought into the fitting to eliminate the cables buring. Could someone please clarify these things for me. Thanks.
Firstly, they have wired a socket to the boiler on the ring and are planning on putting it on a plug top, I thought this was a no no and the boiler needed to be on a dedicated supply. Am I right?
Secondly, they have used IP rated fittings in the bathrooms but there the fittings where you need to put the heat prove sleeving over the cores. Its been wired three plate method but all the cables have been bought into the fitting, now I was under the impression that it need to be joined in the ceiling and a single cable bought into the fitting to eliminate the cables buring. Could someone please clarify these things for me. Thanks.