hi guys!
iv been asked to install a temp supply for a very small festival, and issue a cert, there will be 2x 20kva gennys supplied,
there will be a couple of marquees/ stages,
i havent done much of this kind of stuff before, so any tips or things i should look out for would be useful.
also would a normal eic cert do the trick.
iv been asked to install a temp supply for a very small festival, and issue a cert, there will be 2x 20kva gennys supplied,
there will be a couple of marquees/ stages,
i havent done much of this kind of stuff before, so any tips or things i should look out for would be useful.
also would a normal eic cert do the trick.