I have a 80m run to the bottom of my garden is it practical to run 2 extension cables down the garden and join them together with a make shift link lead both outputs joined together into a single output socket. to allow better current load capability and hopefully less voltage drop to drive my 200a inverter welder, this is temp for a one off welding job
Thanks for any feedback
Thanks for any feedback