R1 + R2
when do you have to do it?
obviously on a new installation...but
on a periodic?
short install when doing a consumer unit change?
Who does what!
Also do you fill in your Max Permitted Zs and your Max Disconnection Times?
 
R1 + R2 ......................................................................................yes
when do you have to do it? ...............................................................every time any work has been done
obviously on a new installation...but
on a periodic?
short install when doing a consumer unit change? ?????............................... who does what
Who does what!
Also do you fill in your Max Permitted Zs and your Max Disconnection Times?....... yes you do have to do it.
 
Last edited:
R1 + R2 ......................................................................................yes
when do you have to do it? ...............................................................every time any work has been done
obviously on a new installation...but
on a periodic?
short install when doing a consumer unit change? ?????............................... who does what
Who does what!
Also do you fill in your Max Permitted Zs and your Max Disconnection Times?....... yes you do have to do it.


maybe i should re prase this.

>R1 + R2<
---------------
when do you have to do it! obviously on a new installation...but...on a periodic? or short install when doing a consumer unit change? ?????
Who does what?
Also do you fill in your Max Permitted Zs and your Max Disconnection Times on your sheets as a must or optional because my sheets do not have these on.
thanks.
 
maybe i should re prase this.

>R1 + R2<
---------------
when do you have to do it! obviously on a new installation...but...on a periodic? or short install when doing a consumer unit change? ?????
Who does what?
Also do you fill in your Max Permitted Zs and your Max Disconnection Times on your sheets as a must or optional because my sheets do not have these on.
thanks.

Yes you must do either an R1 + R2 or an R2 on a PIR. When doing a CU change i would test R1 + R2 or R2 before changing CU to make sure circuits are complete before change of CU.

I also fill in disconnection times and max permitted Zs as they are required on my sheets as i am NICEIC registered.
 

Reply to Test reports!! in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
265
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
756
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
745

Similar threads

  • Question
Generally speaking local earthing will rarely be below a couple of ohms, so in parallel with a TN-S sub-ohm value will make little difference...
Replies
4
Views
693
Interesting question & always gonna get different views on this. EICR testing seems to have changed over the years & not by us the Electricians...
Replies
7
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top