ive got a homer to wire an extension and change the distribution board e.t.c.
All the circuits in the extension will be new circuits.
I was wondering if all the circuits new and existing would need to be tested or just the new ones?
Also, would i be able to test and sign it off or could i do all the work then leave it for someone else to come and test?
Im 17th edition but no 2391 certificate, although testing and inspection was part of my apprenticeship and trade test. I would also have to borrow a tester from somewhere!
ive got a homer to wire an extension and change the distribution board e.t.c.
All the circuits in the extension will be new circuits.
I was wondering if all the circuits new and existing would need to be tested or just the new ones?
Also, would i be able to test and sign it off or could i do all the work then leave it for someone else to come and test?
Im 17th edition but no 2391 certificate, although testing and inspection was part of my apprenticeship and trade test. I would also have to borrow a tester from somewhere!