Excuse my ignorance on this, never had to test a RFC when the conduit was being used as the CPC.
Obviously can't do the usual test for continuity so can't tick that box on the form, will just note that it's an earthed conduit set up.
Where I get more confused is the R1+R2 measurement seeing as I can't cross-connect the line and CPC at the board... What's the conventional thing to do in this case? Just put a link between the adaptable box where both ends of the conduit terminate and the line conductors then test at each outlet as normal?
Cheers!
Obviously can't do the usual test for continuity so can't tick that box on the form, will just note that it's an earthed conduit set up.
Where I get more confused is the R1+R2 measurement seeing as I can't cross-connect the line and CPC at the board... What's the conventional thing to do in this case? Just put a link between the adaptable box where both ends of the conduit terminate and the line conductors then test at each outlet as normal?