....that the 500 panel job you were just starting to work up the quote for actually had a 2nd building on a different plan, with another 500 panels on it.
it'd probably help if we'd been sent the electrical specs along with the plans rather than just the plans for the internal fit out, not sure I really need to know the colour of the paint, or the shelving plan tbh.
it'd probably help if we'd been sent the electrical specs along with the plans rather than just the plans for the internal fit out, not sure I really need to know the colour of the paint, or the shelving plan tbh.