Hi all,
Asked to price up installing a hot tub supply, just wanted some guidance.
Customer not sure on tube yet so doing a couple.
13A Hot tub usually are just plug and play ... BUT.. the tub is going roughly 15 meters away from house, i have no problem with fitting a socket to supply the tub but what about earthing ? its a PME System would that be sufficient or we delving into Earth rod territory ? tub will be mounted on concrete and there are no metal parts anywhere near.( wooden shed next to it with no electric in).i would say its class 2 tub.
for a 32a that shouldnt be to much problem as i would rather use the MATT:E system then install a rod (matt:e basicly eliminated the need for a rod )
Asked to price up installing a hot tub supply, just wanted some guidance.
Customer not sure on tube yet so doing a couple.
13A Hot tub usually are just plug and play ... BUT.. the tub is going roughly 15 meters away from house, i have no problem with fitting a socket to supply the tub but what about earthing ? its a PME System would that be sufficient or we delving into Earth rod territory ? tub will be mounted on concrete and there are no metal parts anywhere near.( wooden shed next to it with no electric in).i would say its class 2 tub.
for a 32a that shouldnt be to much problem as i would rather use the MATT:E system then install a rod (matt:e basicly eliminated the need for a rod )