OP
peteheat
Do you mind me asking what methodology they used?
Did they test it with varying wind and solar input levels, or just in static air at different air temperatures?
If the latter then I'm not surprised it didn't come out too well.
The system was installed with the panel on the roof facing south, the hot water was taken from the cylinder two ways (different tests) the first using a timed release of hot water (very wasteful) to simulate domestic usage the most taken from a 280L cylinder was 100 litres at a time.
The second was using a system link which allowed it to dump the heat into their central heating system.
The entire procedure lasted over six months.