Thoughts of experts welcome. The first smart meter installer walked away as he wasn't three-phase qualified but i'm wondering whether we should get Western Power out beforehand or whether any other work would be recommended. Not sure what the supply box on the right is feeding and I think Noah was the last person to inspect the meter. M
 

Attachments

  • [ElectriciansForums.net] Thoughts of experts welcome - ancient three phase install?
    IMG_0172.JPG
    425.6 KB · Views: 61
  • [ElectriciansForums.net] Thoughts of experts welcome - ancient three phase install?
    IMG_0173.JPG
    446.8 KB · Views: 67
  • [ElectriciansForums.net] Thoughts of experts welcome - ancient three phase install?
    IMG_0174.JPG
    684.4 KB · Views: 67
  • [ElectriciansForums.net] Thoughts of experts welcome - ancient three phase install?
    IMG_0175.JPG
    521.1 KB · Views: 64
  • [ElectriciansForums.net] Thoughts of experts welcome - ancient three phase install?
    IMG_0176.JPG
    501 KB · Views: 60
There's nothing there that Western Power are responsible for that needs any attention.

A bit of a dust over to clear the webs and spiders and as Tel, it may need permits, wildlife study, safe location to remove the spiders to etc.

It should be a straight forward exchange, a new 2 rate 3 phase meter and scrap the timeswitch, spiders permitting.
 
It isn't ancient. The corroded switch fuse may be redundant as it has three fuses sitting on top and evidence of a disconnected cable although it is still switched on. The newer one to the right of this no idea as someone has decided not to identify its purpose. The off peak meter to the right of the meter is likely to be redundant and could be removed.
 
Can't see too much wrong with that , especially the part that WP would be interested in. Earth wires are a bit untidy, there's some unused stuff that could do with removing, and the service connector blocks could do with straightening up.
 
It isn't ancient. The corroded switch fuse may be redundant as it has three fuses sitting on top and evidence of a disconnected cable although it is still switched on. The newer one to the right of this no idea as someone has decided not to identify its purpose. The off peak meter to the right of the meter is likely to be redundant and could be removed.
Seen one eaten through with rust.
 

Reply to Thoughts of experts welcome - ancient three phase install? in the Commercial Electrical Advice area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
267
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
762
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
752

Similar threads

Thanks all for your comments, advice and suggestions. The following is probably pretty boring for most, and is simply a summary of how the job...
Replies
8
Views
843

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top