Okay!
So, I’m looking to plug a knowledge gap.
The set up is a DB in a main dwelling and a second DB in an outbuilding.
The supply from the main dwelling to the outbuilding is 16mm2 split concentric. It is buried in sealed ducting at 1500mm at the deepest point (under the lawn). It comes above ground inside the outbuilding. The other end comes above ground outside the main dwelling between the flags and the gable end. It is protected by a PVC cable guard. The cable is installed in ‘safe zones’ in the outbuilding but less than 50mm deep into the wall (behind plasterboard).
The outbuilding has all circuits protected by 30mA RCBOs.
So, my question. As the cable is not armoured does this cable need RCD protection in the main dwelling from where it originates, and if so, does it need to be 30mA or can it be 100mA and/time delayed, or can it just be put on an MCB?
Thanks in advance.
So, I’m looking to plug a knowledge gap.
The set up is a DB in a main dwelling and a second DB in an outbuilding.
The supply from the main dwelling to the outbuilding is 16mm2 split concentric. It is buried in sealed ducting at 1500mm at the deepest point (under the lawn). It comes above ground inside the outbuilding. The other end comes above ground outside the main dwelling between the flags and the gable end. It is protected by a PVC cable guard. The cable is installed in ‘safe zones’ in the outbuilding but less than 50mm deep into the wall (behind plasterboard).
The outbuilding has all circuits protected by 30mA RCBOs.
So, my question. As the cable is not armoured does this cable need RCD protection in the main dwelling from where it originates, and if so, does it need to be 30mA or can it be 100mA and/time delayed, or can it just be put on an MCB?
Thanks in advance.