hi guys just a question on tncs
TNCS has a combined earth / neutral
am i right in saying If the neutral failed then the whole installation would become live and you would also loose the earth, however if you bonded the incoming services (water/gas) would this become the fault path? through the met, down the bonded pipework, through general mass of earth and back to the transformer like a tt system ??
TNCS has a combined earth / neutral
am i right in saying If the neutral failed then the whole installation would become live and you would also loose the earth, however if you bonded the incoming services (water/gas) would this become the fault path? through the met, down the bonded pipework, through general mass of earth and back to the transformer like a tt system ??