P
p11jor
Today was the last day I could postpone my domestic installer assesment with the niceic,
Automatically I have started to panic!
I know all about zones in bathrooms
Special locations
Supplementary bonding
Ip ratings for board
Were I can run cables I.e horizontal or vertical from points or 150mm perimeters
Tail sizes
Earth sizes
Can rewire a house to bs7671
Hold my 2392 for testing
I have obviously missed stuff of here but is there anything in particular they will look for from me?
Automatically I have started to panic!
I know all about zones in bathrooms
Special locations
Supplementary bonding
Ip ratings for board
Were I can run cables I.e horizontal or vertical from points or 150mm perimeters
Tail sizes
Earth sizes
Can rewire a house to bs7671
Hold my 2392 for testing
I have obviously missed stuff of here but is there anything in particular they will look for from me?