I have recently joined NICEIC. I have done a few jobs since but got asked to quote to replace a consumer unit. Whilst 'quoting' and doing a inspection of the installation. Bonding, CPC in lighting etc. I took a few photos (as I have crap memory).
The consumer unit is being supplied via what looks like, 6mm twin and earth going to a VOP in the kitchen/utility area before the consumer unit.
I need to give a quote for the replacement, but I need to include replacement of the meter tails aswell?
Any thoughts out there, from those more experienced.