Need help with a quote here. I’m wanting some sound advice.
Was called out to the hot water not working so repaired the issue within the panel (micro switch had failed)
Whilst I was there the guy asked me to price up a board change and to have all of this tidied up/put into one box, the hot water he wants on a timer switch so I’m going for a contactor in the new consumer unit and a boost switch (15/30/1/2). I’m Going in with an 18 way Hager unit plus RCBO’s with spd plus blanks and New meter tails. Henley blocks, earthing terminals and just a general tidy up of everything.
The economy 7 radio switch is pretty much defunct but still needs to be kept in amongst it all.
There is a proven 10mm to the water and there is no gas to the building.
I have already completed a global Megger with line and neutral connected together so am pretty comfortable that I’m not going to have too many issues. Cables are all going to be long enough.
Materials I’m at (+20%) around 450 and I was thinking 300 on top of this job done tested and out. I’m expecting it to be a long days work.
I’m based in Cumbria, so advice and guidance from anyone from further north would be greatly appreciated.
Thanks
Was called out to the hot water not working so repaired the issue within the panel (micro switch had failed)
Whilst I was there the guy asked me to price up a board change and to have all of this tidied up/put into one box, the hot water he wants on a timer switch so I’m going for a contactor in the new consumer unit and a boost switch (15/30/1/2). I’m Going in with an 18 way Hager unit plus RCBO’s with spd plus blanks and New meter tails. Henley blocks, earthing terminals and just a general tidy up of everything.
The economy 7 radio switch is pretty much defunct but still needs to be kept in amongst it all.
There is a proven 10mm to the water and there is no gas to the building.
I have already completed a global Megger with line and neutral connected together so am pretty comfortable that I’m not going to have too many issues. Cables are all going to be long enough.
Materials I’m at (+20%) around 450 and I was thinking 300 on top of this job done tested and out. I’m expecting it to be a long days work.
I’m based in Cumbria, so advice and guidance from anyone from further north would be greatly appreciated.
Thanks