have any of you had the wp letters yet stating 3.68 is the absolute max before dno will start charging , thats the emphasis of the letter ie until investigation and time delay nothing more ...take heed
We will carry out a limited network study for single installations up to 4kW and for multiple installations up to a maximum of six where the the output of any single installation is 4kW or less and the multiple installations are balanced across all the available phases, i.e. L1, L2 and L3. Our connection offer for these applications will be free of charge where there is no requirement for work to take place to, for example, reinforce our network to allow the connection.