So I start a new job tomorrow and my first job is first fixing a load of new builds, the thing is, os that I've never worked on new builds before, so what should I expect, I.e, are boxes going to need chasing in? Am I going to have to drill through the joists for cable routes etc, I know every site is different, but what's the norm? Are there any tools that are a must have? I'm trying to gauge as much info as possible before starting
 
most new builds I come across are either all stud walls so dry lining boxes, metal boxes on the walls and then dry lined over the front, you cut out after or sometimes dryliners will do it. If you have metal stud work then you set the metal work to the right centered height so when fixing the back box the bottom is 450mm etc.
a lot of new builds are modular prefab designs and a bit like an ice cream sandwich, two layers of wood with insulation between. drylined inside with a cladding of stone or wood outside.
will likely see a lot of engineered joists and beams with knockouts, so dont go drilling random holes to run cables as it can weaken them. even drilling in the zones cane be a non starter on these, you should use the knockouts.
 
Take your time on the first one to get your routes all sorted and get a feel for where to drill holes etc

Then the second and subsequent units will be much easier
 
Done a lot of 1st fixing on sites,I always do the hardest bits first.
Like fixing/flushing boxes in,drilling joists if required,wiring,sheathing & finally tidying up.
It sounds simple & easy,it’s not,but it’s all in a days sork ,good luck.
 
Ask the joiner to keep his 1st nog by the door above 1200
i used to get the wood butchers to fit noggins sideways 3/4" recessed at switch height. then ideal mounting for K/O box.
 
Tried that before but they got the depths all wrong, especially when there is a box to go on the other side of the nog
what would you expect? 2 boxes would mean a wood butcher using both brain cells when 1 is permanently clock watching.
 

Reply to What should i expect when wiring new build housing? in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
303
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
818
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
889

Similar threads

im just assuming that they are designed to be surrounded by material, and would heat to a certain amount, spreading the heat into the material...
Replies
4
Views
236
N
  • Article
Found a plumbing course but not what I expected? Hi all, I posted a question back in 2020 so rather than bringing that thread back up thought...
Replies
0
Views
336
newbie123
N

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top