Just been to look at a job for a friend of a friend and was wondering what you would charge.
CU change from a 3036 to 17th edition
Supply to garage (ducting in place with draw rope )
2 way CU in garage
2x S/O in garage
2x 5ft Fluro's
1x 1g L/S
Fit 1x S/O below CU
Earthing is in 10mm, tails are 25mm, N to E test at CU is ok, bit of conduit up the side of garage (vertical drop to duct via an IP box 3m length)