Looking at this job, I haven’t touched anything yet so any faults you find are nothing to do with me.
The top switched fuse feeds a CU in the house.
The bottom one is old and the customer would like to use it for another CU in an out building. A 16mm SWA has been run to the box.
Now I am struggling how to think about terminating it all and doing a neat job.
First thing would be to seal the hole and stop the snails.
I’m not sure about using the old switch fuse as the holes cut out on the top don’t look right and is a cover missing? I have seen new ones of these available from wholesalers so that could be an option. But could be a tight squeeze.
There is room for a second meter box along side which could house the 2 switches or just the the second one and then would just need to worry about getting meter tails through.
Would like to hear your thoughts so I can come up with a plan.
Thanks.
The top switched fuse feeds a CU in the house.
The bottom one is old and the customer would like to use it for another CU in an out building. A 16mm SWA has been run to the box.
Now I am struggling how to think about terminating it all and doing a neat job.
First thing would be to seal the hole and stop the snails.
I’m not sure about using the old switch fuse as the holes cut out on the top don’t look right and is a cover missing? I have seen new ones of these available from wholesalers so that could be an option. But could be a tight squeeze.
There is room for a second meter box along side which could house the 2 switches or just the the second one and then would just need to worry about getting meter tails through.
Would like to hear your thoughts so I can come up with a plan.
Thanks.