Hi there.
just fitted an external floodlight and the feed comes from the lighting circuit in the loft.
already a external 400W flood fitted around the corner to the one I was fitting.
Used artic cable 1.5mm (why does it have to be blue or yellow, awful colours to have on the outside of the house).
orignal feed to floodlight already fitted came from old junction box in the lighting circuit. Replaced this feed via dp switch(isolation) to new junction box that feeds both floodlights.


house has Old wiring, junction boxes all round. earth cable stripped back and twisted toghether with no sleeving outside the junction boxes. feed from one JB to the next was twin with an thin separate wire providing the earth. the jb I needed to use had the cover missing and had insualtion just sitting on it.
I replaced the junction box with a new one and used 20A terminal strip inside junction box for extra connections and the earths with sleeving. Replaced the old twin cable and seperate earth with new twin&earth with again 20A terminal strip for the earths outside the junction box.

tests check out fine.

obviously the rest of the house would be like this and I know it was the practice of the time.
my question is have I done enough for my little part of the circuit. or do i have to sort out the earths correctly with sleeving and possibly inside a junction box and do i have to then fix all the junction boxes in the loft area.

any advice would be appreciated.
many thanks
Spikenaylor
 
Yuk! It sounds like you need to price for a total re-wire! :)

To answer your question, blue and yellow are the standard sheath colours for building sites etc: 230V and 110V respectively.

And it’s ARCTIC cable, not artic; that’s a kind of truck (sorry, it’s one of my pet hates, like flourescents).

So-called because the thermoplastic sheath is still flexible at low temperatures. I don’t think it’s good for fixed wiring, and as you correctly identify, bloody ugly. Personally I’d use Hi-tuf or NYY for external lights.

BTW, that’s now 800W (3.5A) of external lighting load on an antique upstairs lighting circuit. Is the wiring up to it?
 
And it’s ARCTIC cable, not artic; that’s a kind of truck (sorry, it’s one of my pet hates, like flourescents).

Glad I'm not on my own, a few years ago fired a complaint at Screwfix as they sold flourescents on their website it was all fixed an email back within 30mins
 
Twisting the CPC's together in the manner you describe was once a standard practice many many moons ago. It is not acceptable now, but then the wiring regs are not retrospective, so if all else is good, then leave it be. Make sure you make some comment about it, but it doesnt demand a rewire, you could reterminate it all into a new JB or enclosure if they will pay. The only problem i can see with exposed and unsleeved CPC's is the potential for fire, as they tend to get hot and glow for a short time under fault conditions.

Cheers............Howard
 
When I do a minor works, job, I'll make sure the circuit tests ok, has earth and is not rubber. I will always install RCD protection if required.
Im not gonna go around the house pulling up boards/insulation trying to find problems that I have no business trying to find. If I saw a JB with external earths/no sleeving etc Im not gonna go re-doing it on a ÂŁ75 quid job.

The way I see it, its like it says on a EICR cert (something along the lines of 'concealed wiring cannot be inspected')
Trying to bring every circuit you do an MW on up to the standard that you would have wired it yourself, will only result in A: You spending half you're life working for free or B: You getting a reputation for demanding ÂŁ300 for jobs that you quoted ÂŁ100 for.
 
Twisting the CPC's together in the manner you describe was once a standard practice many many moons ago. It is not acceptable now, but then the wiring regs are not retrospective, so if all else is good, then leave it be. Make sure you make some comment about it, but it doesnt demand a rewire, you could reterminate it all into a new JB or enclosure if they will pay. The only problem i can see with exposed and unsleeved CPC's is the potential for fire, as they tend to get hot and glow for a short time under fault conditions.

Cheers............Howard

Have you seen the CPC "glow" under fault conditions because I havnt. This would mean during every fault the insulation would melt. Disconnection times are kept low to ensure that no damage is caused components, amongs other reasons.
 
Have you seen the CPC "glow" under fault conditions because I havnt. This would mean during every fault the insulation would melt. Disconnection times are kept low to ensure that no damage is caused components, amongs other reasons.
Yeah sounds dubious to me. Especially as almost all new domestic work/minor work will, if done properly D/C within 200 milliseconds of an earth fault occuring (a 30ma fault that is, much quicker if it was a 30amp fault)
 
Yeah sounds dubious to me. Especially as almost all new domestic work/minor work will, if done properly D/C within 200 milliseconds of an earth fault occuring (a 30ma fault that is, much quicker if it was a 30amp fault)

^ Yup, that's what the adiabatic equation is for! No heat transfer due to no temperature change.
 

Reply to What would you do? in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Hi everyone, If you are looking for reliable EV chargers, check out our top-rated selection at E2GO! ⚡ Please note that all EV Chargers and...
Replies
0
Views
162
  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
1K
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
1K

Similar threads

I don't really know if he is or not, but I would have thought an electrician would be able to calculate cable size or know about requirements for...
Replies
8
Views
679
I've made the required tweaks on the junction box with a 4mm hole bottom, upturned wagos and reduced the exposed copper. I did originally install...
Replies
9
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top