I'll try to be brief, I have a ccu change to do and whilst checking the associated wiring I noticed the ring main is wired in the old twin cable ( no cpc) but seperate earth singles have been run with them. Obviously they should have adequate mechanical protection etc. but if test readings are acceptable can I leave it and comment on the install cert? Or does it have to be completely rewired??