Would entering each RCD as a line on the schedule of test results be correct? If so, what would be entered in boxes such as Zs?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss What’s the correct way to enter RCD’s on a split load board on a schedule of test results? in the UK Electrical Forum area at ElectriciansForums.net
Cheers, this is what I have done previously.Use N/A for not applicable.
If I’ve got a split board, then top line is rcd1 with the rating, trip time etc.. then circuits 1,2,3,4,5 for example. Then another unnumbered line with rcd2, followed by circuits 6,7,8,9….
I find it pointless repeating the same trip times on 5 lines for each of the individual circuits
And real rather than made up.Nothing is right or wrong provided it is clear.
I’ve not been on here for while hope you are all fine and well?Nothing is right or wrong provided it is clear.
Hello stranger. Just 1X for either additional or fault protection now. It changed with the new amendment.I’ve not been on here for while hope you are all fine and well?
When recording the trip times I only record the x5 highest value (both sides of waveform) where the rcd is being used as additional protection. However if rcd is used as fault protection I then record the highest value at x1 (both sides of waveform) is this ok?
I don’t repeat this time for all circuits I normally put RCD 1 then list circuits below and then RCD 2 with circuits below that and record the above just on the RCD section.
Good ok, on the software I use it doesn’t list x1 or x5 so that explains your answer and my question. Guess I need to do the new amendment was waiting for the 19thHello stranger. Just 1X for either additional or fault protection now. It changed with the new amendment.