Where do people record the Ze & PFC of a 3 phase installation, if there is say 10m of 25mm tails between the 4 pole isolator (next to the meter) and the 3 phase distribution board, therefore some (though negligible) resistance?
Do you tend to test at the origin, and record that result, or do you regard the MET as being at the DB (as an extension of what is at the meter position) and do your tests there?
Or both, but only use the one at the origin as a reference, and not record it?
Interested to see what people make of this!
Do you tend to test at the origin, and record that result, or do you regard the MET as being at the DB (as an extension of what is at the meter position) and do your tests there?
Or both, but only use the one at the origin as a reference, and not record it?
Interested to see what people make of this!