Hi, PIR in posh flat. Has low level built-in air conditioning units on dedicated circuit. Buried cables all the way up to the aircon unit. Ok to test fixed wiring from CU up to aircon isolator (a few meters from the aircon unit), or should I take front off aircon unit, disconnect power and test up to there? Also, to clarify a point for me, would you PAT test the aircon unit? (Notwithstanding that it's not portable and is Class II, but let's just assume it did have metallic parts for the sake of this question about overall installation safety).