T
tanglewood
Hi Guys,
Couple of points, I have been sub contracting for a large company doing the electrical side of PV installations for the last 3 weeks. Is there anybody else on here doing the same thing? My question is, are the companys you subcontract for as disorganised as the one i am? now i know the deadlines were a lot tighter than everybody expected, but, I have turned up at some addresses and there arent even any panels on roofs, inverter boxes open and labels missing, this kind of stuff. Any comments appreciated. Secondly, can anybody tell me which connectors i need for Latitude P6/60 250w panels ? another good one, i was told via email the panels were 'Philadelphia', so no problem there, MC4's for extensions to link panels on 'A' frames installed wrong way round, no problem. Gets up on roof, 'Latitude' panels, incorrect connectors! Any help appreciated.
Couple of points, I have been sub contracting for a large company doing the electrical side of PV installations for the last 3 weeks. Is there anybody else on here doing the same thing? My question is, are the companys you subcontract for as disorganised as the one i am? now i know the deadlines were a lot tighter than everybody expected, but, I have turned up at some addresses and there arent even any panels on roofs, inverter boxes open and labels missing, this kind of stuff. Any comments appreciated. Secondly, can anybody tell me which connectors i need for Latitude P6/60 250w panels ? another good one, i was told via email the panels were 'Philadelphia', so no problem there, MC4's for extensions to link panels on 'A' frames installed wrong way round, no problem. Gets up on roof, 'Latitude' panels, incorrect connectors! Any help appreciated.