Hi, first time posting but have read quite a a bit,there's a fantastic amount of knowledge here.Ok here's the situation, I was a leccy mate upto a couple of months ago [aswell as tea-boy,finder of cheap cafes,and had honours in sweeping and tiding]now things are a bit different and very slow,anyway to earn my keep i've been asked to rewire the house. I'm going through building control but would like to know if on there first visit will they want to see plans for the rewire , the rewire will be done over some time as the house is decorated [building control have told me 1 fee even doing it this way and coming out 3-4 times]now this were i need knowledge, there is a wylex fuse box,1 ring for up stairs and down,1 hall-landing lighting,1 for upstairs lighting and 1 for down lighting, do i change the circuits first before the fuse box or check the circuits fix any problems then change the fuse box to a cu and then do the circuits.Hope this makes sense.