I am doing a new consumer unit install on a second story ex council flat. I’ve notice the mains come in in metal conduit with no CPC. On checking further I’ve seen they have split the neutral before the meter and joined an earth cable onto it creating a pme at the fuse board. I believe this can only be done at the cutout and not in the property. As it’s 2nd floor I can’t TT it. When I get access the main cut out room I’ll do an R2 on the conduit but failing this the dno Uk power networks said it’s only their responsibility up to the cutout so who is responsible from the cut out to the flat? Thanks in advance