M
markavo
Hi
I have just acquired a new CM927 wireless programmer. I am wanting to wire it into my vokera linea 24 combi boiler but am getting slightly confused. My boiler currently has no external controls and is controlled only by an internal clock which I am aware I have to take out. I have been looking over the wiring diagrams (http://vokera.co.uk/wp-content/uplo...8_installation_and_servicing_instructions.pdf) and can't quite make out which, if any would apply to the CM927. The wiring diagram for external time switches also includes an external stat. But in the case of the CM927, there is no external stat to be wired, just the relay box.
Any guidance would be appreciated
I have just acquired a new CM927 wireless programmer. I am wanting to wire it into my vokera linea 24 combi boiler but am getting slightly confused. My boiler currently has no external controls and is controlled only by an internal clock which I am aware I have to take out. I have been looking over the wiring diagrams (http://vokera.co.uk/wp-content/uplo...8_installation_and_servicing_instructions.pdf) and can't quite make out which, if any would apply to the CM927. The wiring diagram for external time switches also includes an external stat. But in the case of the CM927, there is no external stat to be wired, just the relay box.
Any guidance would be appreciated