There was an electrical fire in the British Library at St Pancras on the 10th June 2022. It has cause the shutdown of one floor and various other problems. Does anyone have any other news?
Hi there
I’ve got some spots to install in some shelves being put up. This sounds very straight forward I know but I was only thinking, do they need to be fire rated in the sense the room above is habitable (but obviously this isn’t a ceiling space)?? I know in the ceiling they’d have to be but...
A recent conversation with Aico technical enquiring to maybe fit wifi devices in a commercial environment, workshops, business units. Surprisingly, you will need permission from Building control or a Fire Chief before installing them as they are for Domestic or residential use only. Does this...
Hi all, not been around in a while but I'm working through a quote at the moment and found this at the end of the equipment (AC kit) suppliers quote.
From the icons provided were definately talking B type and not B curve.
For the job in question this one paragraph statement could add...
Hi all I'm looking for some advice recently i left a data cable installer apprenticeship cat5 to cabs etc (was a one year course level 3 at the end) to pursue an apprenticeship in eletrics (standard 3 year am2 at the end course) recently I've seen and heard alot of conflicting statements about...
Hi all, this is just a question to put my mind at rest and to see if I'm right. I'm not a qualified spark and I'm not the person(s) involved with the work.... OK here we go!
My workplace (large Plc) are having the staff toilets done up a bit. A hand dryer was removed from the wall and chase...
Hi all, I'm looking for some help & advice understanding addressable fire systems. I'm helping a small team out pulling in enhanced FP for a fire install. I've done a little bit of addressable fire stuff before, but not much. I'm just looking for info with regards to Interfaces, power supplies...
Hey guys!
I'm hoping to get some advice. We are in the process of building an entertainment unit which will have an electric fire floating on the front. However, this fire comes with a plug. I guess my question is, what's the best way to plug this in so the wire can't be seen? I wanted to add...
Hello,
I applied for a retrospective completion certificate for kitchen relocation. The work was done about 7 years ago. The building standard surveyor says that I need to install interlinked smoke and heat alarms to comply with the new fire regulations. I got in touch with different...
Hello all,
Firstly, I am not installing this myself and have several pros coming in to quote in the new year. A couple of years ago, most of the first fix was done with with FP200 cables to each room and corridor.
I am now looking for recommendations for addressable fire systems/panels for a 7...
Good evening all,
I have added an extra smoke alarm to an extension that I have just finished. I have been asked to provide a fire alarm certficate. I am a assuming it is the modification certificate. However when I look at the NIC certs it states that this is for grade A Systems. Mine is a...
Evening all,
If you are adding extra smoke alarms to a property, due to an extension do you need to provide additional certification apart from the test certficate.
Hello, I am looking for advice in the best way to seal a vent on a control cabinet. The MCC is 1000x600x300 wall mount with a standard vent at the side. The customer has asked about this after a fire risk assesment. I have honestly never put any thing like that in before as most MCCs were in...
As (I believe) PAT testing includes fixed equipment connected to the electrical installation by an FCU (eg hand driers, built in ovens etc.) I have been trying to figure out if a Fire Alarm control Panel should be PAT tested and if so by who. Has this subject been addressed before? Does anyone...
Hi guys I have just done an Eicr and 1of my findings was that the fire alarm panel was fed by SWA and I am wondering if that needs replaced with fp200 or similar?
Thanks in advance
Kenny
Hi all, about to do a condition report on a grade 2 listed 4 bedroom property, the owner is moving and wants to rent it out. The consumer unit is a PLASTIC split board RCD sited in a cupboard under the only set of stairs .The board and installation is neatly installed (even the bonding cables...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc