Search the forum,

Discuss 50mm (2x2) clear services void between plasterboard ceiling below and vapour barrier above: in the UK Electrical Forum area at ElectriciansForums.net

D

Deleted member 150200

With current regs is 50mm enough, I know in floors they should be 50mm clear of the plasterboard, but this is a flat roof with vapour barrier and insulation above. Secondly would you agree that the cables should ideally be clipped with metal clips due to new fire regs.
 

Reply to 50mm (2x2) clear services void between plasterboard ceiling below and vapour barrier above: in the UK Electrical Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top