Hi there, im looking some general advice related to this eicr.

im a bit lossed here, so would it be 2 eicr?
or do i just splice two sheets together with the relevant information?

on a seperate not i also noticed today when i had a wee look that his main water bond cannot be verified, is this a dealbreaker?
i mean i see a group of 6mm earths leaving the board(with no other purpose) but theres nothing at the stop cock.
It a block of flats (circa 1970)

Any advice would be greatly appreciated and also if anyone could recommend a specific course that teaches all the in/outs of eicr?
would it be 2391?

I mean your tradesman shows you testing and you get it at college and then you pass the test etc but no one really goes into detail and tells you how to deal with eicr(s) etc
 
haha, maybe so.

specifically im talking about the section of the eicr that asks for the details of the main switch (its before the circuit chart page and test results)
It asks for the main switch details.
So if you have two different boards with different main switches then my thinking is that both these details should be recorded.

Im not saying i know it all, and if i cant find an answer then i most likely just tell the guy that im not going to complete it.
I do try and do a good job for people.

Any advice on a course?
 
Don't worry Neon, you'll get some helpful answers soon. I think it's an ok question apart from the bit about the lack of Main bonding being a 'deal breaker', I'm not sure what that means.
If the incoming water supply is in metal and there is no main bonding visible (can you see all around it?) then I would code it C2. If I couldn't see all around it then I would code it FI.
I would also test it to see what resistance it has to the MET. I do get a little confused with the 0.05ohm figure, but if there is a 6mm leaving the CU and the stop cock tests <0.05 to earth then I think it highly likely it's got a Main bonding cable attached to it.... I wonder what replies I'll get to that! (Plus the 6mm would have to have been in place for a significant amount of time and show no signs of thermal damage if it was to be classed as ok as it should be 10mm)
 
thanks for your reply.

i just meant that it would be a fail without the verification?
I would note it as a c2.
it can be clearly seen where it enters and the bond is not there.
Maybe it attaches somewhere else in the house (after the "t", who knows)
I dont think i would mark it down as verified with just a test, id have to see it.

yeah i know it should be 10mm but these 6mm do look old, and i think they used to do it with that all the time.
Don't worry Neon, you'll get some helpful answers soon. I think it's an ok question apart from the bit about the lack of Main bonding being a 'deal breaker', I'm not sure what that means.
If the incoming water supply is in metal and there is no main bonding visible (can you see all around it?) then I would code it C2. If I couldn't see all around it then I would code it FI.
I would also test it to see what resistance it has to the MET. I do get a little confused with the 0.05ohm figure, but if there is a 6mm leaving the CU and the stop cock tests <0.05 to earth then I think it highly likely it's got a Main bonding cable attached to it.... I wonder what replies I'll get to that! (Plus the 6mm would have to have been in place for a significant amount of time and show no signs of thermal damage if it was to be classed as ok as it should be 10mm)
thanks
 

Reply to EICR - 2 boards, 1 with an off peak split and one with regular supply in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

I'm practising EICRs on friendly locations as I'm still in training - technically done my 2391-52 but frankly need loads more practise. I've just...
Replies
11
Views
915
HI , potential 2 bed 1970’s bungalow buyer here…. Our surveyor (RICS) has pointed out there is no circuit breaker to the electrics (fuse board...
Replies
16
Views
2K
Hey guys, Im starting to put my company out there more. And this is all a new journey for me being an apprentice and now being qualified/2391-52...
Replies
25
Views
3K
Hi All, I am looking for some expert advice on EICR sets etc. I live in a rented house which has a private water supply, meaning we have to change...
Replies
29
Views
3K
Hi, need some advice, I moved over from Sse in 2020 to Octpus energy. Whilst I was with SSE I was on E10 when I went over to octopus they put me...
Replies
1
Views
482

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock