I’ve got a job coming up with two Heatmeiser UH8 control centres which need to fire the same combi boiler. Is it just a case of paralleling up the volt free connections LS and LR or am I missing something. It seems too easy! Also, because there are no time switches and the system will be controlled from the stats 24/7, can anyone see a problem with this setup? The plumbers have been and left all the gubbins on site. I will be going there on Tuesday to have a look but wanted to familiarise myself with the system beforehand since I don’t work on too many heating systems. Apparently the wet pants have already lost the boiler instructions, but once I’ve got the make and model, should be able to down load them from somewhere. All the wiring is already in the wrong places since the clowns have moved the manifolds. They couldn’t even keep to their own plan. Just as well they got a couple of extra days off over Easter. Who knows what other chaos they could have created in that time…lol.