Just had a 'heated' debate with an MEP contractor on the phone who is doing first fix for a job we're on. (We're doing the controls, av, security etc)
I told him to make sure that his team label all the cables as per my spec, every cable, each end!
He told me I was being ----, and I'm not sure if I should take that as in insult on a compliment. I've got over 500 sections of cable going in on this job, some for the network, some for controls comms, some AV some for DALI, CCTV, Security and so on...... I just want them all labelled...... (which I do on all of our jobs, even when we're doing 1st fix).
Your thoughts?
I told him to make sure that his team label all the cables as per my spec, every cable, each end!
He told me I was being ----, and I'm not sure if I should take that as in insult on a compliment. I've got over 500 sections of cable going in on this job, some for the network, some for controls comms, some AV some for DALI, CCTV, Security and so on...... I just want them all labelled...... (which I do on all of our jobs, even when we're doing 1st fix).
Your thoughts?