Discuss 3p Tpn converted to Sp in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net
Yea defo needs new 4 pole main switchI was meaning generally, and especially on boards with a four pole isolator. Doesn't appear likely to be a problem with the board in question.
Does it Ned a switched N?Yea defo needs new 4 pole main switch
Single phase needs DP isolationDoes it Ned a switched N?
if so why?
No it’s off a Mcb @ DBIt may have DP isolation but not at that location.
For that board no it just links the three lines. I believe the new Eaton ones become a double pole switch which also switches the neutral.Do the conversion kits include a main switch that switches the neutral?
I know that I would fit a DP main switch, never seen a single phase supply without one.For that board no it just links the three lines. I believe the new Eaton ones become a double pole switch which also switches the neutral.
Explain why it needs Coding.I know that I would fit a DP main switch, never seen a single phase supply without one.
Its a EICR so it’s been in place for some time, classification code C3 maybe after reading all these messages ?
Reply to 3p Tpn converted to Sp in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.