I had an eicr done recently, the electrician gave a C2 for the meter tails having their outer insulation stripped back too far.

Can I take a piece of the grey insulation off a spare tail and cut and glue it onto the missing piece to clear the C2? Much easier than having to strip back as it's at the meter.
 

Attachments

  • [ElectriciansForums.net] Meter tail insulation
    20211223_141700.jpg
    132.5 KB · Views: 29
Inform your electricity supplier that your electrician has identified a dangerous fault with your electric meter.

they should fix it free in my opinion.
 
Looking at picture, Call/inform DNO they will send someone or authorise electrician to fix it , (DNO will reseal the cut out ) if its going to isolation switch ....( looks like it is )
 
You can't see any exposed copper , so it its not really dangerous

It would be nice if it could be re-terminated so that the outer sheath was butted up tight to the hole but I wouldn't be busting a gut to fix it if it were in my house
 
Is it exposed to touch or is it in a cabinet only accessible by use of a tool / key?

I have seen it argued that if it's the latter then it's a C3.

I wouldn't be busting a gut to fix it either but it should be seen to at some point.
 
C2 by definition is POTENTIALLY DANGEROUS.

if that is what the electrician has reported then if you are renting it out then you have 28 days to get it fixed.
by deferring the problem to the network operator as they are authorised to re terminate to the meter, you will have a paper trail or show that the C2 fault has been repaired.

if you stick some cover over it with glue, you leave yourself wide open for any issues with it. E.g. if the terminals are loose and the cable has pulled out then there could be problems with heat/ arcing .
 
I dont realy see a problem with it. When I was an instalation inspector for the Electricity Board in the early 80s that is the way we were told to do it. Strip the outer insulation back by 12mm to show the inner colour.
 
I dont realy see a problem with it. When I was an instalation inspector for the Electricity Board in the early 80s that is the way we were told to do it. Strip the outer insulation back by 12mm to show the inner colour.
Yeah... but they've had 32 mm stripped back !
 
The meter tails require to have two layers of protection, having so much exposed of the basic installation is an issue for the EICR. If they were behind a barrier or in trunking that would count as additional protection but they aren't.
The exposed parts are between the Isolator and the Henley, I was slightly confused as both sides of the isolator had a seal, however the seal on the output can be removed, the isolator switched off and the tails retrimmed and put back in so that will solve the issue. From the isolator switch onwards in owners equipment so no issue to do it.
Personally I wouldn't have coded it as a C2, the last two EICR made no mention of it or had an issue, but if I want the C2's cleared then I either have to sort it or get someone else who isn't a thorough to redo the EICR
 
should have only been a C3 IMO. if on the otgoing side of the isolator, then easy fix. if on the meter side, then it's probably been done by a meter monkey, so get your supplier to sort it.
 
Just re instate the sheath as you suggested or wind some ID tape over it to form a new sheath
The insulation is intact, the sheath really not much of a issue
 

Reply to Meter tail insulation in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
259
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
749
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
738

Similar threads

In the 80's I was taught that with PME earthing arrangements we used 16mm for the main earthing conductor, some went a bit crazy and were bonding...
Replies
11
Views
2K
  • Question
Yeh that’s my thinking. I have to supply the box so can order a bigger 3 phase option to give myself a bit more room
Replies
3
Views
834

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top