Client needs an SPD fitting but no room in c/u or adjacent. Best bet looks like a parallel connection into the tail blocks in the meter cabinet with an adjacent 'standalone unit' ie with overcurrent protection. Anybody done this? Any reason I shouldn't? Is it ok to use board PEN connection block for earth?