    LED Bulbs won't work together on same circuit.

    That was my first thought too!
  2. ImpededLoop

    2 way 2 gang light switch problems

    I've seen 1960's houses in the south east wired like that, but frequently the landing light uses the live from the downstairs lighting circuit and the neutral from upstairs; the borrowed neutral causes problems when installing dual RCD boards!
  3. ImpededLoop

    2 way 2 gang light switch problems

    It looks like the 2 reds which are twisted together should be in the L1 terminal of the bathroom light switch. However without seeing it all in real life it's hard to be certain. I'd give an electrician a call. It should be straightforward to rectify.
  4. ImpededLoop

    LED Bulbs won't work together on same circuit.

    Are they 12V MR16 lamps?
  5. ImpededLoop

    Local Heroes....A British gas innovation

    They called me a couple of weeks ago to ask if I wanted to be one of their "local heroes". I wasn't interested. They did say that you need to be VAT registered to be accepted.
  6. ImpededLoop

    Just joined - saying hi

    Welcome along!
  7. ImpededLoop

    Transformer in LED light fitting not working

    Check that there's a 230V supply to the light fitting first. If there is the problem will either be the transformer/driver or the LEDs themselves. In most cases it's the driver at fault. Has it always been an LED fitting or was it a halogen fitting that's been converted to LED? If it's a...
  8. ImpededLoop

    no rcd circuit on 5x5 splitload board

    Looks like the bottom neutral bar on the right is straight off the main switch. I'm guessing there's a third neutral bar at the other end of the board for RCD 2.
  9. ImpededLoop

    no rcd circuit on 5x5 splitload board

    Probably easiest to see if Schneider sell high integrity boards. If they do, you just need the busbar from the main switch with two outgoing prongs (one for the submain MCB and one for the existing RCD.
  10. ImpededLoop

    Backdating an invoice?

    Agreed!
  11. ImpededLoop

    Unpaid Invoices & Paying Suppliers

    Probably best to get the thread moved to the Arms section first. It could further jeopardise any possible payments if you're found to have been bad-mouthing the company on a public forum.
  12. ImpededLoop

    aerial advice for block of flats.

    It depends what the client wants, but often satellite and terrestrial aerials are supplied to each outlet along a single coax cable using multiplexers. You could always run the cables and get an aerial company to supply and install the hardware.
  13. ImpededLoop

    Change it? Move it?

    Ventilation equipment is permitted in zone 1 so long as it's suitable according to manufacturers instructions. 701.55
  14. ImpededLoop

    DADE

    I'd seen the rigid type with the adjustable cutting blades before, but hadn't ever looked at the DADE
  15. ImpededLoop

    DADE

    Very easy. It's made from a rubber material so you can pull it down and position it accurately before drilling.
  16. ImpededLoop

    DADE

    Well I thought I had all the tools and gadgets going! I bought a dust and debris eliminator (DADE) this week and I'm really impressed. It's used for catching the dust from drilling downlighters. Probably the simplest tool I own, but definitely one of the best (perhaps after my wire coat...
  17. ImpededLoop

    Work clothing

    Snickers trousers and snickers hoodie. Polo shirts from the local work wear shop.
  18. ImpededLoop

    Advise about going out on my own?

    So long as you're in the process of joining when you do the work you should be ok. You won't need to certify the work a second time, just do the building control notification once you've been accepted to the Part P scheme.
  19. ImpededLoop

    Electric Radiators versus Storage Heaters

    It's difficult to quantify as there are several variables. A single rate tariff is normally cheaper than a dual rate tariff. It's also possible that the heaters will be used less as they will only be switched on when needed rather than guessing tommorrows temperature with a storage heater...
  20. ImpededLoop

    Completing Zs box on schedule of test results

    Perhaps the chandelier was installed before there was a power supply to the building, so only dead tests were possible at that time.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top