Hi Steve
I would probably still use something like a debox for your downlight connections so that you have somewhere to terminate your earth cables, unless your downlights have an earth terminal?
Far to cheap, double that and you should be ok. Materials alone will be well over £100. Is this a new circuit if so plus the cost of mcb or rcbo depending on d/b.
Excellent thats the way I had planned on doing it. Both supplies are 3 phase and both currently being used. Single gas meter and water meter so maybe was one building the whole time.
Thanks for your replys
Not to sure but im hoping they are. Will have a proper look into it tomorrow when back on site. Would the supplier be able to tell me if they are?
Thanks
Lewis
Hi
Just in the process of completing some remedial works on an industrial unit with two tncs supplies, one is 100a the other 200a and on opposite sides of the building! The main issue picked up from the testing was the lack of bonding to all the site services. This is where im after some...