LewisS
-
Hi
Just in the process of completing some remedial works on an industrial unit with two tncs supplies, one is 100a the other 200a and on opposite sides of the building! The main issue picked up from the testing was the lack of bonding to all the site services. This is where im after some help, not a problem to bond incoming gas water building fabric air lines etc but will this need to be linked to the 100a main earthing terminal? I was planning to run my bonding from a new met at the 200a supply as this is bigger and should more then protect the smaller supply.
Any help would be appreciated.
Lewis
Just in the process of completing some remedial works on an industrial unit with two tncs supplies, one is 100a the other 200a and on opposite sides of the building! The main issue picked up from the testing was the lack of bonding to all the site services. This is where im after some help, not a problem to bond incoming gas water building fabric air lines etc but will this need to be linked to the 100a main earthing terminal? I was planning to run my bonding from a new met at the 200a supply as this is bigger and should more then protect the smaller supply.
Any help would be appreciated.
Lewis