Hi everyone
Just wonder is anyone seen these before? Bit afraid, as it may be asbestos. Maybe someone know for sure.
It's AB British Standard written on the front.
Came to install electrical fireplace and found this beauty after cutting the opening through plasterboard.
Any thoughts?
Thanks
Seems you are the guy who would do anything to get power going... :)
No chance I am considering this option with building 40 years old and spaghetti junction in bus bar chamber.
Still thanks for your help...
Correct, its not immediately dangerous but it is in many other ways. I did tell my manager to go the safety route, but I think he is a bit soft and failed.
Thanks.
This site changed a lot since last time I been here, where the thanks button gone???
Hi all you smart folks, wonder if you can help me.
I am from London worked on job in Southend last 3 days, commercial premises, 400A 3ph.
Had to connect the new 63A 3ph fused isolator to main bus bar chamber, which required to shut the main fused switch to the building, which is broken and not...
It makes sense if to keep all happy, but is this necessary? And obviously if to keep consistent I should install 50mm bond across as the original one, thanks
Hi everyone,
Wasn’t here for a while, would like to get some opinions on my issue, if you don’t mind folks.
Gas bonding issue, gas incoming pipe is at one point and it’s boded as soon as it enters the premises, the meter is about 20 meters inside the premises, I have my boss insisting that...
Obviously it does not involve domestics, as they usually unreported, so the article does not give the full picture. Not surprised that construction sites did perform well.
Yeah, pretty much new, that this will be the answer, the only thing which is annoying is that you still need to go and figure it out with all the incomers to the building, earthing, bonding ( 22 bonding conductors on MET), sub, sub mains and so on.....uhh:33:
Hi, haven't been here for a while.:waving:
Just a quick one, what tests and certificates needed, if installing a couple of circuits, 2A loads from the control panel in the plant room, it will be supplying boilers
Don't say its a full wack EIC , and if I am concerned only with circuits I am...