Hi, haven't been here for a while.:waving:
Just a quick one, what tests and certificates needed, if installing a couple of circuits, 2A loads from the control panel in the plant room, it will be supplying boilers
Don't say its a full wack EIC , and if I am concerned only with circuits I am installing?
Thanks
Al
Just a quick one, what tests and certificates needed, if installing a couple of circuits, 2A loads from the control panel in the plant room, it will be supplying boilers
Don't say its a full wack EIC , and if I am concerned only with circuits I am installing?
Thanks
Al