got to add in some breakglasses, ceiling detector and sounder to an existing fire 12v fire alarm system in a local village hall as theve put a new room on the side
which cerrtificate would i have to fill out? im a full napit member
A farmer wants me to run a new supply to a building, it's to be run in 35mm armoured, part of the route is a 25m overhead span between buildings, is this okay for the cable or should I be getting an extra pole in the middle put in to take the weight
thats a good table for calculating demand for a property but i'd end up with 60-80kw using it to the letter of the law depending on how generous i was beiing which seems unrealistic for 6 small holiday pods in the beer garden of a seaside pub
i would agree most of the time there would be hardly any draw but i'm thinking of the times when maybe a group hires all 6, goes out surfing for the day and the first thing the'd do when they came back in an evening would to be to put on the heating and all have a shower/put the oven on
i haven't been told the make/model of anything being used. the information i was given im assuming was supplied to the owner from the manufacturers of these pods. as far as i know these pods arrive complete and i will be just connecting them up. with regards to the water boiler i'd guess at it...
i'd take a guess at any business wanting to make money would like all 6 let every week 12 months a year but in reality in will be busier in the summer
why wouldnt the hot water be on for a shower etc while they have the heater switched on in the main room?
a local pub i do alot of work for wants to build 6 pod style holiday lets in its beer garden and has applied to western power to see if the existing supply can cope with the demand
the existing supply is 2 phase with a 200 amp fuse in each phase leading to a busbar system. ive been asked to...
Hi Everyone
Im trying to create a fairy light canopy in a temple as a permenant install that will be used as a wedding venue
the temple is roughly 8.5m square and i want to start all the strings in the center and maybe have 15-20 strings about 5m each (so they bow slightly rather than being...
fantastic boards, all i've used over last 2 years really, 90 quid plus vat for a 14 way board and 8 rcbos and only 11 quid per additional rcbos
had 2 main switches on the early design overheat but never any problems since, so quick and easy can do a normal board change in under an hour with...
thank you. i shall go back to the customer with a revised maximum demand figure and see if i can obtain some more details from the customer about the size of the cutout western power can supply
in normal circumstances at what point should the renewable energy firm of submitted the proposal for...
how would i say i achieved that figure for maximum demand as doing it the proper way or any other rule of thumb way actually achieves higher than my 84 amps
Yes of course they are but its not a factor they budgeted for neither do they have the budget for as most self builds are done very tightly. my quote for labour only was £2400 although the materials have been £7000
my opinion is the renewable energy company should of checked the existing supply...
at the moment there isn't a supply to the house, just a temporary site supply in a box outside. the supply used to supply a 3 bed bungalow before it was knocked down.
to reinstate the existing electrical supply to the new house is only £400 which is what the customer had budgeted for.
i am wiring a new build property for a private customer, im just on a labour only quote to do power and lighting circuits
there is an external firm doing the heating system which includes an air source heat pump and a 3.68kw solar system
they have asked me for my maximum demand so they can...
i wouldn't of thought the'd have one. its only a couple of pensioners running it who live next door, the'd never heard of pat testing or an eicr till i mentioned it to them at a village meeting
i guess i ought to push them in the direction of getting a fire risk assesment done
ive been asked by the people who look after the village hall in my village if it needs a fire alarm?
i would of presumed so as its hired to the public but does it need to be a 24v system with a panel wired in fp200 or can it be an aico 240v interlinked mains system
the village only has 70...
on my tester it shows greater than the maximum parimeters for a ze test using the existing earth stake
british gas did a routine visit and flagged it up
Hi
one of my customers have contacted western power distribution about getting pme installed as there is no reading when an earth stake is installed
they have done a site visit and have asked their electrican (me) to do send of a request form
i have trawlled the website and cannot find the...