Search results | Page 3

Search results

  1. MJPD29

    What to pay day rate

    Minimum £1000 for 40 hrs or 200 a day
  2. MJPD29

    How to lan work two computer

    Use a network switch?
  3. MJPD29

    UK Replacement Unvented Boiler installed - Do I need a new Electrical Box?

    Unless you have an rcd in a separate enclosure then it would be worthwhile upgrading that board.
  4. MJPD29

    Could my meter be wired up wrong?

    Your bill doesn’t sound unrealistic at all for an all electric apartment. Sadly your epc from 2020 is more or less irrelevant at this stage
  5. MJPD29

    Electrician level 3 design projects

    Do you not have a tutor at college? Or are you self learning
  6. MJPD29

    Installing plug sockets in steel furniture.

    I don’t think they are metal cabinets, from my understanding it’s the metal back boxes he’s talking about.
  7. MJPD29

    Fuseboard change advice on running the pyro cables into the board

    Not sure I follow here, but can you not just gland them into the board?
  8. MJPD29

    Recommended laundry appliances

    We’ve got beko washing machine / indesit dryer. Near the cheapest we could get. Don’t see any benefit in buying expensive branded names in appliances and none of them seem to last any longer. Just realised this is 2 weeks old.
  9. MJPD29

    Compex Electrician experience

    No not really some parts are geared towards different industries and only require certain parts, you could do all and cover all parts but it would be hard work I’m sure.
  10. MJPD29

    Compex Electrician experience

    There are a few different parts and fields. Which one are you looking at?
  11. MJPD29

    Advice on reduced live-neutral reading

    Responsibility is with whoever made final connections at the shower. The person that tested the supply at the shower has likely got those readings because of a bad connection on the supply to the shower, therefore not their responsibility. I would be looking at whoever made that final connection.
  12. MJPD29

    Cable termination of concentric cable

    For us chaps who work within the rules, we tend to sleeve cores to suit ourselves.
  13. MJPD29

    Metal Tool Box or Alternatives

    All joking aside I’ve had 3x dewalt tstak boxes for several years now and they’ve been great and they didn’t break the bank either. One even has drawers
  14. MJPD29

    Advice on reduced live-neutral reading

    Sounds like this is where the issue could be
  15. MJPD29

    Advice on reduced live-neutral reading

    Who fitted the shower? Not the circuit/isolator or anything else, the actual shower
  16. MJPD29

    Metal Tool Box or Alternatives

    You must have tried every tool box on the market by now. This won’t stop until you have a 10 grand snap on roller box.
  17. MJPD29

    Can I pay for AM2s myself ?

    Whenever I did the am2 you had to be in employment until the finish date as your employer had to sign off on your apprenticeship along with the college, although that was 15 years ago, doing it yourself without an employer was not an option. Things may have changed though so best ask your college.
  18. MJPD29

    Help with design project

    So do I but no one will do your work for you. Best thing to do is post what you have done and ask for help, not asking everyone to show you what they have worked hard to do so you can copy it.
  19. MJPD29

    What is the front of a dist board called

    It’s a cover. I think we can leave it at that.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top