Qualified electrician here but doing some DIY with regards to moving our intercom from the front door to our new driveway gates. Is there a particular, more rugged type of 8-core you can by that is okay with immersion in water etc. Our builders positioned flexible conduit in strategic positions...
Setup:
Consumer unit fed via sub main from a 60A fused isolator switch. This is connected to the service head MET via a 2m earth connection.
How would one go about both calculating and documenting the Zs?
Would you be treating the fused isolator switch as it’s own db and therefore be...
We are using a Bell BL106-4 on the main door. Code entry to open the door, buzzers for each flat. Simple. Only now we want to add access control to a metal gate at the end of a path a mete 10m away. Am I best off adding another Bell BL106-4 at the gate and wiring in-line or is there a smarter...
In London, I was quoted 12k by UKPN for a straight 10m run from the pavement to our front door. That didn’t include any ground works on our side. Go figure.
I’m having a new wall constructed. Whilst digging the foundations the workers came across the incoming main. Note that the steel armour is entirely exposed. U.K. power came to confirm it was their cable but didn’t mention anything relating to the cables condition. Surely this is a ticking time...
Does this look the same to you? Difficult to tell when screwfix quote 16mm whether they mean the cable or conductor. British General Plastic Gland Kit 10-16mm² Flat Cable - https://www.screwfix.com/p/british-general-plastic-gland-kit-10-16mm-flat-cable/3442p
Good suggestions. Just feels wrong to be having to drill my own holes into the CU. Can't understand why Hager wouldn't include knockouts for SWA given how common the setup is in the UK?
How would one terminate SWA into a Hager consumer unit given all of the knockouts are rectangular? They don't appear to make any form of gland. Feels like a crap finish to just leave it hanging in the back?
Thanks. I've had an IDNO state that there is a scheme by which they can do the work and then 'sell' the infrastructure asset back to the DNO claiming almost a rebate? So a 20k job might after the sale cost me 10k. Anyone come across this before?
How would one manage the re-location of five meters owned by five different energy companies during a mains supply upgrade? The old supply will be disconnected at the same time the new is energised. All five meters will need to move to a new location approx 1 meter away.
What is the best way...
Ended up emailing pretty much the entire Lloyds list. Many who won't do single connections but two who have so far expressed interest in quoting.
UK Power wants around £12.5K to disconnect existing and run a new 200a three-phase service 10m. This doesn't include laying the duct or digging the...
I am looking to have a new 3 phase 200amp supply run to a house/flats conversion that is currently running off a single phase 80amp supply. UK power has confirmed there is a cable at our boundary that can be tapped and provided quotes. It is about as simple a cable run as you can get, around 5m...
Last year I had a large cast-iron balcony constructed with steps down into my garden. The balcony is bolted into the walls and also into the pavement where it meets the garden. Is there a requirement to earth this? If so, should it be a separate 10mm CPC direct to the CU or could I link it to...